we are doing it
give a bid and she wrote a letter back
bid was 700 was not to soiled been easy
she wanted scotchgaurd on the whole thing 2900 sq ft
said she been payin half of that for last 20 yrs
so i wrote her back with a
jon don scotchgaurd print out on useage instructions and cost of product.
Heck if i would send out the guys and do it my cost would have been close to 350
just for labor gas and chemicals
I stated in my letter if she really thinks the other guys have been puttin protector down all this
time.My findings are in black and white she needs to read all the material i sent her.
But not to good on day cares so far
Sendin out to doctors offices been pretty good
lost only one to price that i can remember.
Sendin to lawers offices also no good so far
but still sendin